TES Technical Engineering Support logo

Planning Engineer (m/f)

TES Technical Engineering Support
Full-time
On-site
Bridgwater, ENG

JobsCloseBy Editorial Insights

TES Technical Engineering Support seeks a Planning Engineer (m/f) for the Hinkley Point C nuclear project in Bridgwater. You will develop and integrate MEH schedules, optimise sequences, manage data in planning tools, and support 4D/5D capabilities to drive safe, on time delivery within the 16-week look ahead and IWS, coordinating interfaces with HPC programmes and teams. Essential: experience delivering complex projects in regulated environments, strong English; MEH delivery. Desirable: 4D/5D planning, nuclear construction background, relevant qualifications and memberships (RICS CIOB RIBA ICE CIBSE). Tips: tailor your CV to MEH nuclear, quantify schedule improvements, highlight digital tools and safety focus, confirm onsite availability, and include a concise cover note addressing the 16-week horizon and interfaces.


Technical Engineering Support (TES) is an engineering company created over 30 years ago, specializing in the coordination of tests and industrial commissioning. TES also supports its customers in participating in studies and coordinating the assembly of industrial equipment.

As part of our activity, we have a position to fill as Planning Engineer (f/m) for integrate the Hinkley-Point U.K. nuclear project

Accountabilities:

  1.       The development, integrations, design, testing & commissioning of detailed construction schedules within the MEH phase

  2.       Considering all aspects of integrated mechanical, electrical and HVAC (MEH) planning for works on the Hinkley Point C project. This will involve conducting integrated schedule reviews to develop detailed, optimised construction delivery sequences and resource loaded schedules. 

  3.       Integration of construction works activities with all HPC programmes within the MEH schedules to optimise the planning process. The role will be instrumental in addressing interfaces at. The detailed construction schedules support the overall project integrated works schedule (IWS) and the 16-week look ahead process to un-constrain work and deliver schedule adherence.

  4.       The management and update of the schedule data within the planning and production control toolsets

  5.       Support for the performance optimisation / influence of the 4D capability on the performance of Safety, Quality, Cost, Time & Risk across the life-cycle delivery of the MEH scope of Work

  6.       Ensure that MEH installation schedule is supported by the relevant digital tool sets and data to ensure that its performance always meets the needs of the delivery of the MEH Scope of Work

  7.       Ensuring that MEH Programme construction schedules are produced, managed, and maintained in accordance with the planning procedures and contract requirements.

  8.       Reporting of site progress using various methods, and ensuring the construction are informed of relevant schedule data.

Key Deliverables:

 

  1.       Advocating safe and effective planning of works for site construction.

  2.       Ensuring that conventional and nuclear safety considerations are recognised as essential to the success of the project and built into the planning processes.

  3.       Developing detailed plans to a facility and/or area basis which integrate, co-ordinate and sequence work activities to achieve the optimum construction sequence paying particular attention to contractor interfaces at site within the 16 -week horizon.

  4.       Communicate schedule resource requirements, durations, and associated quantity information to the construction leads

  5.       Support the project periodic look ahead process with the rolling extract of an integrated schedule

  6.       Identifying planning scope, major constraints, and contract requirements

  7.       Identifying quantities and factors affecting the programme

  8.       Establishing and agreeing with Delivery construction outputs and agree working hours

  9.       Develop resource, material, and quantities profiles from the level 5 schedule to support delivery readiness, particularly bulk MEH material and equipment delivery needs

  10.    Develop schedule metrics and reporting to allow measurement of schedule adherence and planned/actual schedule performance.

  11.    Work with the 4D team to develop animated schedule sequences and enhance the 4D tools and capability on the project, particularly for construction coordination purposes.

  12.    Work with the construction teams and the PDO to develop visual management capabilities for deployment in the field by the construction and contract partner teams

  13.    Encouraging the development of HPC lessons learned to support future project execution.

Requirements

Essential

·       Experience in delivering highly complex projects in regulated environments

·       Strong communication skills in English required, knowledge of French can be an advantage.

·       Industrial experience in MEH delivery

 

Desirable

  1.       4D and 5D planning experience

  2.       Nuclear construction background.

  3.       A construction trade or OND/HND in Mechanical or Electrical Engineering or Equivalent in Construction Management or related subject is desirable, as is Professional membership of one or more of the following: RICS/CIOB/RIBA/ICE/CIBSE, or a demonstrable level of experience based on previous project assignments.